CME Center
• 2.5 million sq. ft. asset, with a 60,000 sq. ft. commercial redevelopment.
• Designed by Krueck Sexton Partners.
• 24’ height x 10’ wide, state-of-the-art, curved glass façade replaced a storefront system, increasing the interior square footage of the ground floor lobby by 20,000 sq. ft.
• Remediated the many circulation challenges throughout the building.
• Economic success achieved by leveraging redevelopment to drive momentous amount of leasing, approximately 1.5 million sq. ft. from 2016 – 2019.
• Occupancy increased from 80% to 96%. Market rents increased by approximately 20%.
• Construction achieved through refined logistics and phasing all while 6,000 occupants entered and used the building.
• Total project cost: $75 million.